Tesla filed this release with the SEC as Exhibit 99.1 to a Form 8-K on Oct. 21, 2026 at 4:41 p.m. ET.
Q3 2026 Update 1 Exhibit 99.1
Highlights 03 Financial Summary 04 Operational Summary 05 Manufacturing & Hardware 06 Supporting Infrastructure 07 SI & Other Services 08 Outlook 09 Photos & Charts 10 Key Metrics 23 Financial Statements 26 Additional Information 32 2
S U M M A R YH I G H L I G H T S (1) Refer to the Reconciliation of GAAP to Non–GAAP Financial Information slide (2) Free cash flow = operating cash flow less capex; (3) Includes cash, cash equivalents and short-term investments; (4)Active driver supervision required; does not make the vehicle autonomous; Note: all information herein refers to the current quarter unless otherwise noted. Profitability $0.7B GAAP operating income $0.8B GAAP net income $1.7B non-GAAP net income1 In Q3, we maintained strong momentum on many projects spanning Super Intelligence (SI), robotics and renewable energy that will be critical to building a future of Amazing Abundance. Strength in our core business also continued, and we achieved our second consecutive quarter of TTM revenue in excess of $100B. deliveries in North America – our most mature market – a nearly twenty percentage point sequential increase. We believe that FSD is driving demand in markets where it is available, and we continue to work with regulators to get it approved in other markets. We started providing Robotaxi rides using Cybercabs on September 3 in Austin. Cumulative unsupervised Robotaxi miles grew eightfold quarter over quarter, driven by sustained double-digit weekly growth. We ended the quarter with the largest backlog for our passenger vehicles in four years. We rolled out the updated Tesla Semi that is produced on our high-volume manufacturing line in Nevada and unveiled the Next Gen Roadster on October 15. While battery availability continued to be the limiting factor in increasing auto volumes in the quarter, we have made additional progress in securing future supply, as we work toward our goal of maximum utilization of our factories. Demand for our Energy Storage business remained strong in the quarter, with our highest- ever order rate and backlog. Energy storage is the fastest way to add power to the existing grid and is critical to data center uptime. We expect rising data center demand to continue driving demand for our products. Megafactory Texas began production, with planned capacity of 50 GWh. We also advanced LFP supply domestication in the U.S., shipping the first Megapacks built with LFP cells from our factory in Nevada. We continue to invest in the future through R&D and Capex spend across our businesses, including SI, robotics and energy. Much hard work lies ahead, but we are as optimistic as ever. Thank you to our supporters as we continue to execute on many challenging and important projects. Cash Operating cash flow of $6.3B Free cash flow2 of $1.5B $1.9B increase in our cash and investments3 Operations Produced and delivered our 10 millionth vehicle Launched Cybercab into the Robotaxi fleet in Austin Record production at Gigafactory Berlin 3
F I N A N C I A L S U M M A R Y (Unaudited) ($ in millions, except percentages and per share data) Q3-2025 Q4-2025 Q1-2026 Q2-2026 Q3-2026 YoY Total automotive revenues 21,205 17,693 16,234 20,516 20,560 - Energy generation and storage revenue 3,415 3,837 2,408 3,139 2,881 - Services and other revenue 3,475 3,371 3,745 4,581 4,605 Total revenues 28,095 24,901 22,387 28,236 28,046 Total gross profit 5,054 5,009 4,720 4,751 5,494 Total GAAP gross margin 160 bp Operating expenses 3,430 3,600 3,779 4,353 4,776 Income from operations 1,624 1,409 941 398 718 - Operating margin -322 bp Adjusted EBITDA 4,227 4,154 3,668 3,273 3,900 - Adjusted EBITDA margin -114 bp Net income attributable to common stockholders (GAAP) 1,373 840 477 1,114 787 - Net income attributable to common stockholders (non-GAAP) 1,770 1,761 1,453 1,153 1,697 - EPS attributable to common stockholders, diluted (GAAP) 0.39 0.24 0.13 0.32 0.22 - EPS attributable to common stockholders, diluted (non-GAAP) 0.50 0.50 0.41 0.33 0.48 - Net cash provided by operating activities 6,238 3,813 3,937 4,697 6,263 Capital expenditures (2,248) (2,393) (2,493) (5,789) (4,732) Free cash flow 3,990 1,420 1,444 (1,092) 1,531 - Cash, cash equivalents and short-term investments 41,647 44,059 44,743 43,524 45,447 4
Q3-2025 Q4-2025 Q1-2026 Q2-2026 Q3-2026 YoY Model 3/Y production 435,826 422,652 394,611 442,936 457,387 Other models production 11,624 11,706 13,775 8,822 7,004 - Total production(1) 447,450 434,358 408,386 451,758 464,391 4% Model 3/Y deliveries 481,166 406,585 341,893 467,762 478,237 - Other models deliveries 15,933 11,642 16,130 12,364 8,295 - Total deliveries(1) 497,099 418,227 358,023 480,126 486,532 -2% of which subject to operating lease accounting 10,230 10,996 3,430 7,580 6,911 - Cumulative deliveries(2) (all-time; mil) 8.5 8.9 9.2 9.7 10.2 Active FSD Subscriptions(3) (mil) 1.04 1.10 1.28 1.48 1.74 Total end of quarter operating lease (new vehicle) count(4) 167,163 163,075 151,991 141,876 133,720 - Global vehicle inventory (days of supply)(5) 10 15 27 15 11 Storage deployed (GWh) 12.5 14.2 8.8 13.5 13.7 Supercharger stations 7,753 8,182 8,463 8,704 8,904 Supercharger connectors 73,817 77,682 79,918 82,357 84,465 O P E R A T I O N A L S U M M A R Y (Unaudited) 5 (1) Vehicle production and delivery numbers represent passenger vehicles sold to customers. (2) In accordance with our 2025 CEO Performance Award, metric includes all new Tesla vehicles delivered to customers plus any unsupervised Robotaxis placed into commercial operation. For further detail see our 2025 Proxy Statement. (3) In accordance with our 2025 CEO Performance Award, metric includes both upfront payment and monthly subscriptions and excludes free trials. For further detail see our 2025 Proxy Statement. (4) Beginning in Q4’25, end of quarter operating lease count pertains only to new vehicles. Q3’25 has been adjusted to exclude used vehicles. (5) Days of supply is calculated by dividing new vehicle ending inventory by the relevant quarter’s deliveries and using 75 trading days (aligned with Automotive News definition).
M A N U F A C T U R I N G & H A R D W A R E Installed Annual Manufacturing Capacity Region Product Capacity Status Automotive California Model 3 / Model Y >550,000 Production Shanghai Model 3 / Model Y >950,000 Production Berlin Model Y >375,000 Production Texas Model Y >375,000 Production Cybertruck >125,000 Production Cybercab >125,000 Production Nevada Tesla Semi 25,000 Production TBD Roadster - Design development Energy Generation and Storage California Megapack 40 GWh Production Nevada Powerwall >6 GWh Production Shanghai Megapack 20 GWh Production Texas Megapack 50 GWh Production Robotics California Optimus - Early Ramp Texas Optimus - Construction approach capacity. Production rates depend on a variety of factors, including equipment uptime, component supply, downtime related to factory upgrades, regulatory considerations and other factors. Construction includes factory and infrastructure buildout as well as tool installation. Automotive We achieved record quarterly deliveries in several markets, including Canada, Australia, Japan and Taiwan. Given the strong demand we are seeing across various markets, we remain focused on increasing production across our factories and attained record production at Gigafactory Berlin. We began volume production of Tesla Semi, our Class 8 heavy-duty truck. The top variant can go 500 miles at full 82,000 lbs gross combination weight while achieving an efficiency of 1.7 kWh/mile. That efficiency allows the Tesla Semi to use a third of the energy used by a comparable diesel truck to haul the same payload. In a transportation market where energy is one of the largest components of total cost per mile, this will provide a meaningful advantage to Tesla Semi operators. Energy Generation and Storage We began production at Megafactory Texas. Energy storage demand is increasingly aligned with SI infrastructure demand as grid constraints and power availability create more opportunities for Megapack to be deployed. Megapack excels in off-grid and on-grid applications, supplying large data center loads, buffering oscillating demand, helping interconnection grid-compliance and strengthening the grid – all with less local fossil fuel generation. Robotics Optimus production began in Fremont on our high-volume lines. The bots coming off this line are the first production-quality bots that we have manufactured. While we will continue to iterate on the hardware and manufacturing process, we have proven that the current manufacturing process for Optimus is suitable for a commercial product. 6
S U P P O R T I N G I N F R A S T R U C T U R E Installed Capacity Region Asset Capacity Status SI Training Compute1 Texas Cortex 1 >105 MW Production Cortex 2 >120 MW Production Battery Cell Manufacturing Annual Capacity Nevada LFP 7 GWh Early Ramp Texas 4680 >40 GWh Production Cathode Materials 10 GWh Early Ramp Lithium Refining 30 GWh Early Ramp Berlin 4680 - Construction approach capacity. Production rates depend on a variety of factors, including equipment uptime, component supply, downtime related to factory upgrades, regulatory considerations and other factors. Early ramp capacity includes expected capacity. Construction includes factory and infrastructure buildout as well as tool installation. SI Compute We plan to reach 400 MW of SI training compute by the end of the year, supporting the development of both vehicle and humanoid robot autonomy software. Additionally, we continued construction for the Austin Fab, where we plan to start commissioning equipment in 2027. Battery We continue to make progress expanding battery manufacturing capacity and securing future supply, even as battery availability remains a limiting factor on the pace of our global vehicle production ramp. Critical projects include vehicle pack capacity in Berlin, cathode material production and lithium refining in Texas and LFP cells in Nevada for our energy storage products. We shipped the first Megapacks comprised solely of our own LFP cells, an important milestone to localizing this important battery type. We continue to increase production of our 4680 cells to support the ramps of both Cybercab and Tesla Semi along with higher Model Y volumes. Other Supporting Infrastructure -over- year. Our Supercharger for Business program also grew to over 600 stalls. These customer- owned chargers allow us to further scale the charging network while ensuring the same performance standards and service standard as Tesla-owned locations. We deployed our first Accordion Supercharger, which is pre-assembled in the factory and cheaper to install. We also deployed the first pre-assembled Megacharger to support the Tesla Semi ramp. 7 Tesla SI Training Capacity Ramp (MW of Compute) 0 50 100 150 200 250 300 350 400 450 Existing Capacity Future Planned Capacity (1) Excludes 40 MW of other compute not part of Cortex 1 or Cortex 2.
The complete release, with its financial tables, is Exhibit 99.1 of the filing.