Mining is one of the toughest tests for machinery, because the site itself works against the machine with heat, humidity, dust, heavy loads and long hours. China’s SINOMACH told IM that it has built its mining expertise by answering those tests site by site, and its excavators have now logged close to 20,000 hours of continuous operation in customer fleets.
At one gold mine in South America, six SINOMACH excavators work around the clock in different shifts, with operating hours typically reaching 20 hours per day. In summer the ambient temperature climbs to 45°C and above while humidity stays high, so the hot and humid environment is a severe test of reliability.
To address these conditions, the international operations team studied the sites together with the R&D team and turned field feedback into a heat package specified machine by machine. SINOMACH: “The point of the package is not more power but a wider working envelope: it decides how long the machine can keep working when the temperature rises. The radiator and the hydraulic oil cooler are enlarged by 10% to 20%, which lifts the full-load rating from the standard 45-50°C to 55°C ambient, so above 50°C the excavator still works at full load without a high hydraulic oil temperature alarm, power derating or engine stall, and at the same duty its hydraulic oil temperature runs 5-8°C lower than on the standard machine.”
To deal with the dust, a cyclone pre-cleaner is used plus a two-stage air filter double the air filter service interval from 250 to 500 hours. A 125°C high-temperature wiring harness with sealed connectors reduces electrical faults caused by insulation ageing and contact oxidation. For night shifts, a long-life LED lighting system replaces the previous lamps and keeps the working area clearly visible to the operators, while wear protection on the undercarriage and the cab extends component life under constant load. To deal with mosquitoes, insects, leaves and other sticky debris, the team added protection nets over the air intakes and selected materials that are easy to clean, which limits the effect of this debris on equipment operation.
On the other side of the world, the SINOMACH team faced the opposite extreme: mines in cold regions where winter ambient falls far below zero. At low temperatures hydraulic oil thickens, seals become brittle, cold starts consume production hours and component life shortens. The answer was a cold package built around reliable starting and continuous winter operation. Standard machines become difficult to start below about -15°C; with the low-temperature engine calibration, intake preheating and jacket-water heater of the package, the excavators start reliably at -30°C, and with the diesel-fired preheater the working range extends to -40°C.
Batteries are upsized to 2 to 2.5 times the normal-temperature capacity, because a lead-acid battery loses around 60% of its capacity at -30°C and a first-time start still has to be guaranteed. Hydraulic oil changes from HD46 to L-HV32: below -20°C the standard grade becomes so viscous that the pump inlet starves, which shows up as jerky movements accompanied by high-frequency noise, and the low-temperature grade removes that failure mode.
The fluid set is completed by -45# antifreeze, 10W-30 engine oil and 0#/1# grease, none of which freezes or thickens in winter service. Low-temperature nitrile and fluoro-rubber seals stay flexible at -30°C instead of cracking, which cuts oil seal leaks, while a diesel-fired cab heater plus insulation preheats the cab before the shift, shortens start-up preparation and keeps operators productive through the cold.
SINOMACH: “The effect is measurable: below -25°C, machines without a low-temperature configuration show a clear rise in hydraulic system failures, whereas configured units generally hold winter availability above 90%. With this package the equipment has run for over 20,000 hours in the CIS region.
The company concluded to IM: “In mines around the world, SINOMACH construction machines answer clients’ concerns with solutions built on their operating conditions, and they earn recognition beyond borders. The numbers tell the story better than any claim: full load at 55°C ambient, 250 to 500 hours between air filter services, reliable starts at -30°C, winter availability above 90%…that is how a specialist in construction machinery earns a place in global competition.”
The post SINOMACH on a comprehensive approach to challenging mining conditions for excavators appeared first on International Mining.